



This 330.75 kW DC installation was a unique project to complete.
The roof of Calvary South Chapel OC had numerous obstructions, making the installation of a large solar array quite complex to avoid shading issues. Greentech Renewables assisted us in exploring various ballast racking options to find the best combination of equipment that would fit within the roof's footprint. This project included SolarEdge inverters, IronRidge ballasted racking, and Silfab Solar modules.
They also connected us with designers to complete our array engineering and organized multiple delivery days to accommodate the site's limited loading area.
Location
San Clemente, CA 92672
United States
Total size
330.75kW
Type
Commercial
Installed
Installer

Supplied by